    Build time

    So we ordered a new 370DV the end of January and our dealer told us it would come off the production line around the end of March then go to get full body paint, after that it would be shipped.

    Two questions about the build process:

    1) How long does it take from step one until it comes of the line? How long is the actual manufacturing process?

    2) We are having the independent suspension installed from the factory, do they do that on the line or is it sent over to MORyde after its built to have it changed?

    Thanks!!

  2. #2
    Site Team Second Chance's Avatar
    Join Date
    Jul 2014
    Location
    Wherever...
    Posts
    9,126
    Mentioned
    191 Post(s)
    Tagged
    0 Thread(s)
    @huntr70 can probably answer your questions more accurately. From our visit to the factory several years ago, the actual build process takes a few days (less than a week). As far as I know, the IS is still installed at the MORryde facility in town - but things may have changed since we had ours done.

    Rob
    U.S. Army Retired
    2012 F350 DRW CC LB Lariat PS 6.7
    2020 Solitude 310GK-R, MORryde IS, disc brakes,
    Sailun LRG tires, solar, DP windows, W/D
    (Previously in a Reflection 337RLS)
    Full time since 08/2015

  3. #3
    Left The Driveway
    Join Date
    Jan 2024
    Posts
    6
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Thanks! I was just thinking it was a waste to build it with the standard suspension only to have MORyde cut them all off a week later.....

  4. #4
    Site Team Second Chance's Avatar
    Join Date
    Jul 2014
    Location
    Wherever...
    Posts
    9,126
    Mentioned
    191 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by Arksoon View Post
    Thanks! I was just thinking it was a waste to build it with the standard suspension only to have MORyde cut them all off a week later.....
    I agree - it is. The frames are built by Lippert at one of their facilities and delivered to the GD factory with suspension in place.

    Rob
    U.S. Army Retired
    2012 F350 DRW CC LB Lariat PS 6.7
    2020 Solitude 310GK-R, MORryde IS, disc brakes,
    Sailun LRG tires, solar, DP windows, W/D
    (Previously in a Reflection 337RLS)
    Full time since 08/2015

  5. #5
    Commercial Member huntr70's Avatar
    Join Date
    Sep 2013
    Location
    PA
    Posts
    4,516
    Mentioned
    240 Post(s)
    Tagged
    0 Thread(s)
    From what I was told, GD orders the frame from Lippert when a retail order is taken, and they go directly to MorRyde for the independent install before ever going to the GD plant.

    The actual time is a matter of days. The scheduling and waiting for paint is the slow part.

    If it is schedule to be offline end of March, the dealer should have it by the end of April.
    Steve- Inventory Manager at Tom Schaeffer's RV, Shoemakersville, PA www.tomschaeffers.com
    [email protected]
    2011 RAM 3500 SRW Outdoorsman Edition 4X4, 6.7 Cummins--TWEAKED!
    2021 Reflection 310RLS

  6. #6
    Site Sponsor ajg617's Avatar
    Join Date
    Jul 2020
    Location
    New Hampshire
    Posts
    2,442
    Mentioned
    32 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by huntr70 View Post
    From what I was told, GD orders the frame from Lippert when a retail order is taken, and they go directly to MorRyde for the independent install before ever going to the GD plant.

    The actual time is a matter of days. The scheduling and waiting for paint is the slow part.

    If it is schedule to be offline end of March, the dealer should have it by the end of April.
    Is the date on the build sheet the date it rolls out the door (after weighing) or just an arbitrary date the build sheet is printed?
    Robin & John
    2020 Ram 3500 LB SRW 4WD Crew Laramie 6.7HO Aisin, 55gal Titan 4014 payload
    2022 Solitude 310GK-R - Dual pane, factory solar & Onan, 8K axles with discs, 18K GVWR, W/D, Heat Pump, Goosebox, Battleborn

    2023 stays

  7. #7
    Commercial Member huntr70's Avatar
    Join Date
    Sep 2013
    Location
    PA
    Posts
    4,516
    Mentioned
    240 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by ajg617 View Post
    Is the date on the build sheet the date it rolls out the door (after weighing) or just an arbitrary date the build sheet is printed?
    It is the date the unit is weighed as it comes out of production.
    Steve- Inventory Manager at Tom Schaeffer's RV, Shoemakersville, PA www.tomschaeffers.com
    [email protected]
    2011 RAM 3500 SRW Outdoorsman Edition 4X4, 6.7 Cummins--TWEAKED!
    2021 Reflection 310RLS

  8. #8
    Left The Driveway
    Join Date
    Jan 2024
    Posts
    6
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Well, received and update from the dealer this weekend and our unit should be rolling of the line the end of this week and should be at the dealership mid April. We were planning on early to mid May so this is a good surprise!

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

DISCLAIMER:This website is not affiliated with or endorsed by Grand Design RV, LLC or any of its affiliates. This is an independent site.